Page 13 - Sustainability Report 2021 - Indonesia Power
P. 13
MENGHADIRKAN PENGEMBANGAN ENERGI BARU TERBARUKAN MENUJU KARBON NETRAL
PROVIDING DEVELOPMENT OF NEW RENEWABLE ENERGY TOWARDS CARBON NEUTRALITY
Jenis Pembangkit Lokasi Kapasitas Dampak
No. Type of Power Location Capacity Impact
Plant
2 Pembangkit PLTM Harjosari 3x3,3 MW Dampak Ekonomi:
Listrik Tenaga MHPP Harjosari - Biaya operasi yang relatif murah
Mini Hidro (PLTM) Dampak Lingkungan:
Mini-Hydro Power PLTM Cileunca 2x0,5 MW - Ramah lingkungan karena tidak menimbulkan pencemaran
Plant (MHPP) MHPP Cileunca Dampak Sosial:
PLTM Gunung 2x1,56 MW - Solusi bagi permasalahan energi di daerah-daerah terpencil karena
Wugul* konstruksi yang sederhana serta pengoperasian yang relatif mudah
MHPP Gunung Economic Impact:
Wugul* - Relatively low operating costs
Environmental Impact:
PLTM Lambur 2x4,0 MW - Environmentally friendly because it does not cause pollution
MHPP Lambur Social Impact:
- The solution to energy problems in remote areas because of its simple
construction and relatively easy operation
3 Pembangkit PLTS Landbase 1,5 MWp/ 1,2 Dampak Ekonomi:
Listrik Tenaga Grati* MWac - Efisiensi Biaya Pemakaian Sendiri
Surya (PLTS) SoPP Landbase - Optimalisasi penggunaan lahan yang tidak terpakai di lingkungan
Solar Power Plant Grati* pembangkit untuk mendapatkan nilai ekonominya
(SoPP) Dampak Lingkungan:
- Mendukung pengurangan emisi CO 2
- Mendukung pemerintah dalam porsi bauran energi dari energi baru
terbarukan
Economic Impact:
- Self-Use Cost Efficiency
- Optimizing the use of unused land in the power plant’s environment for its
economic value
Environmental Impact:
- Supporting the CO emission reduction
2
- Supporting the government in the energy mix portion of the new and
renewable energy
4 Pembangkit PLT Hybrid Nusa 3,5 MW Dampak Lingkungan:
Listrik Hybrid Penida - Menurunkan timbulnya emisi CO dan polusi udara yang bisa berdampak
2
Hybrid Power Hybrid Power Plant pada perubahan iklim
Plant Nusa Penida - Menurunkan volume limbah B3
- Meminimalisir timbulnya limbah cair
Environmental Impact:
- Will reduce the generation of CO emissions and air pollution that impact
2
climate change
- Will reduce the volume of B3 waste
- Will minimize the generation of liquid waste
Catatan: Note:
*telah COD di tahun 2021 *has been COD in 2021
Dalam Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT In the 2021-2030 Electricity Supply Business Plan (RUPTL) of PT
PLN (Persero) 2021-2030, salah satu sasaran yang ingin dicapai PLN (Persero), one of the targets to be achieved is to achieve a
yaitu tercapainya bauran energi (energy-mix) pembangkit tenaga better energy mix for power plants by the end of 2025, at least by
listrik yang lebih baik pada akhir tahun 2025 minimal sebesar 23%. This is one of the steps towards net zero emission.
23%. Hal ini merupakan salah satu langkah menuju net zero
emission.
Atas terlaksananya program-program pengembangan EBT pada In 2021, because of Indonesia Power’s NRE development
tahun 2021, Indonesia Power berhasil meningkatkan produksi programs, the Company has successfully increased its energy
EBT pada bauran energi Perusahaan dari 6.473,20 GWh pada mix by 2.21% originating from NRE production, from 6,473.20
2020, meningkat 2,21% di tahun 2021 yaitu sebesar 6.616,45 GWh. GWh in 2020, to 6,616.45 GWh in 2021.
PT INDONESIA POWER 2021 Sustainability Report
13