              Go Live Co-firing PLTU Adipala dan PLTU   Beroperasi secara komersial   Penandatanganan Kerjasama antara
              Pelabuhan Ratu                   (Commercial Operation Date) PLTS Landbase   Indonesia Power, Tuas Power dan EDF
              Go Live Co-firing SPP Adipala and SPP   Grati (1,5 MWp)          Renewables tentang Kerjasama Impor Tenaga
              Pelabuhan Ratu                   Commercial Operation Date of SoPP   Surya ke Singapura
                                               Landbase Grati (1.5 MWp)        Signing of Cooperation Agreement between
                                                                               Indonesia Power, Tuas Power, and EDF
                                                                               Renewables on Solar Energy Imports to
                                                                               Singapore




















                           Desember 2021           3     Desember 2021           2     November 2021
                           December 2021                 December 2021                 November 2021





              Akuisisi lahan PLT Hybrid Nusa Penida 3,5   Beroperasi secara komersial   Pilot Project Bahan Bakar Jumputan Padat
              MWac sebagai showcase kegiatan KTT G20   (Commercial Operation Date) yaitu PLTM   (BBJP) Tempat Pembuangan Sampah Akhir
              di Bali                         Gunung Wugul (3 MW)              (TPSA) Bagendung
              Land acquisition for the Nusa Penida   Commercial Operation Date of MHPP   Pilot Project of Solid Recovered Fuel (BBJP)
              3.5 MWac Hybrid Power Plant land as a   Gunung Wugul (3 MW)      at Bagendung Final Landfill (TPSA)