Page 11 - Sustainability Report 2021 - Indonesia Power
P. 11
MENGHADIRKAN PENGEMBANGAN ENERGI BARU TERBARUKAN MENUJU KARBON NETRAL
PROVIDING DEVELOPMENT OF NEW RENEWABLE ENERGY TOWARDS CARBON NEUTRALITY
28 Mei 2021 6 September 2021 29 September 2021
September 2021
May 2021
September 2021
Go Live Co-firing PLTU Adipala dan PLTU Beroperasi secara komersial Penandatanganan Kerjasama antara
Pelabuhan Ratu (Commercial Operation Date) PLTS Landbase Indonesia Power, Tuas Power dan EDF
Go Live Co-firing SPP Adipala and SPP Grati (1,5 MWp) Renewables tentang Kerjasama Impor Tenaga
Pelabuhan Ratu Commercial Operation Date of SoPP Surya ke Singapura
Landbase Grati (1.5 MWp) Signing of Cooperation Agreement between
Indonesia Power, Tuas Power, and EDF
Renewables on Solar Energy Imports to
Singapore
Desember 2021 3 Desember 2021 2 November 2021
December 2021 December 2021 November 2021
Akuisisi lahan PLT Hybrid Nusa Penida 3,5 Beroperasi secara komersial Pilot Project Bahan Bakar Jumputan Padat
MWac sebagai showcase kegiatan KTT G20 (Commercial Operation Date) yaitu PLTM (BBJP) Tempat Pembuangan Sampah Akhir
di Bali Gunung Wugul (3 MW) (TPSA) Bagendung
Land acquisition for the Nusa Penida Commercial Operation Date of MHPP Pilot Project of Solid Recovered Fuel (BBJP)
3.5 MWac Hybrid Power Plant land as a Gunung Wugul (3 MW) at Bagendung Final Landfill (TPSA)
showcase for the G20 Summit in Bali
PT INDONESIA POWER 2021 Sustainability Report
11