            Sampai dengan 31 Desember 2022, PLN Indonesia Power telah   Until December 31, 2022, Indonesia Power has appropriated
            mempergunakan dana sekuritisasi EBA pada proyek-proyek   EBA securitization funds in the following business development
            pengembangan usaha berikut:                        projects:


                                               31,86%            16,34%            13,76%           12,81%
                     Total Disburse:
                       Rp 4 Triliun
                       Rp 4 Trilion



                                            PLTGU Grati Add On   PLTU Kaltim (1 x 27 MW)  PLTGU Tambak Lorok   PLTU Suralaya 9 - 10
                                             Blok 2 (183 MW)  SPP East Kalimantan  Blok III (779 MW)  (2x1000 MW)
                                            CCPP Grati Add On    (1 x 27 MW)    CCPP Tambak Lorok  SPP Suralaya 9 - 10
                                             Block 2  (183 MW)                  Block III (779 MW)  (2x1000 MW)


                                                11,11%           9,46%             4,12%             0,55%



               Rp2,5 T          Rp1,5 T


                                            Mobile Power Plant   PLTU Kalbar-1   PLTD Senayan    PLTA Poigar (30 MW)
                                              (MPP) Papua       (2x100 MW)         (101 MW)        dan beberapa
                                               (120 MW)      SPP West Kalimantan-1  DPP Senayan (101 MW)  pembangkit lain
                2017    2018                                    (2x100 MW)                       HPP Poigar (30 MW) and
                                                                                                  several other plants


            Dari beberapa proyek yang mempergunakan dana sekuritisasi EBA   Of projects which appropriated EBA securitization funds, SPP East
            tersebut, PLTU Kaltim-1 kapasitas 2x27,5 MW di Muara Jawa telah   Kalimantan-1 with capacity of 2x27.5 MW in Muara Jawa has been
            beroperasi tanggal 1 Desember 2018, PLTD Senayan kapasitas 101   in operation since December 1, 2018, DPP Senayan with capacity of
            MW telah beroperasi pada 5 Desember 2019 serta PLTGU Grati   101 MW has been in operation since December 5, 2019, CCPP Grati
            Add On Blok 2 kapasitas 183 MW telah beroperasi pada 30 Juni   Add On Block 2 with capacity of 183 MW has been in operation
            2020 dan PLTU Kalbar 1 (Unit 1 dan 2) berkapasitas 2x100 MW   since June 30, 2020, and SPP East Kalimantan 1 (Unit 1 and 2) with
            telah beroperasi pada tanggal 3 Februari 2021 dan 25 Juni 2021.   capacity of 2x100 MW have been in operation since February 3,
            Selain itu,  Mobile Power Plant  Papua di beberapa lokasi juga   2021 and June 25, 2021. In addition, Mobile Power Plant Papua in
            telah beroperasi, antara lain MPP Sorong kapasitas 50 MW, MPP   several locations have been in operation, such as MPP Sorong with
            Biak kapasitas 10 MW, MPP Merauke-2 kapasitas 20 MW, MPP   capacity of 50 MW, MPP Biak with capacity of 10 MW capacity,
            Manokwari-2 kapasitas 20 MW, MPP Timika kapasitas 10 MW, dan   MPP Merauke-2 with capacity of 20 MW, MPP Manokwari-2 with
            MPP Nabire kapasitas 10 MW. Di tahun 2022, PLN Indonesia Power   capacity of 20 MW, MPP Timika with capacity of 10 MW, and MPP
            sedang dalam proses pembangunan PLTGU Tambak Lorok Blok 3   Nabire with capacity of 10 MW. Starting in 2022, Indonesia Power
            berkapasitas 779 MW yang direncanakan akan mulai beroperasi   has been constructing CCPP Tambak Lorok Block 3 with capacity of
            secara komersial pada Juni 2023 sedangkan PLTU Suralaya 9-10   779 MW. This power plant will operate commercially in June 2023,
            diestimasi COD pada 2027 sesuai RUPTL.             while estimated COD for SPP Suralaya 9-10 is 2027 according to
                                                               Electricity Supply Master Plan (RUPTL).




















                                                                                             2022 Annual Report
             www.plnindonesiapower.co.id                                                                      163
                                                                                             PT PLN Indonesia Power